Show trains at on from      Auto-refresh    

Service 32009033 (H13375) 4H67 08:42 Crewe Basford Hall SSN to Guide Bridge Virtual Quarry Freightliner Heavy Haul

Update ID3536 14/08/23 19:26:00
Created14/08/23 19:26:00
Deleted
Bank holiday running
STP IndicatorPPermanent
Train UIDH13375
ATOC codeZZ
UIC code
Days runsTu Th Fr
Schedule Dates12/12/23 - 31/05/24
Signalling ID4H67
Deduced headcode
Train categoryJ9Unrecognised
TOC Headcode
Train service code54606070
Business Sector
Power typeD Diesel
Timing Load600
Speed075mph
Operating Characteristics
Seating Class 
Sleepers 
Reservations 
Connection Indicator
Catering Code
Service Branding
Train StatusFFreight

Display schedule in plain text

Display schedule in old format

 
Real time data is shown for Thursday 28/03/24   Show real time data for
  Received  EventTRUST Event Data
28/03/24 05:42:31ActivatedTrain ID = "424H67CD28"
 Schedule source "C", TP Origin Timestamp 28/03/24, TP Origin -
 Origin dep time 28/03/24 08:42:00, TSC "54606070", call type AUTOMATIC mode NORMAL, WTT ID "4H67C", Sched Origin Crewe Basford Hall SSM
28/03/24 05:43:22Change IDOld ID: 424H67CD28 New ID: 426H67CD28

ArrivePassDepartScheduleActual
LocationPWTTPublicActualWTTActualWTTPublicActualPath-LineAllowancesActivitiesPNotes
Crewe Basford Hall SSN 08:42 08:31 11 EarlyTrain begins.
Crewe Sorting Sidings North08:47 No report - IL
Crewe Salop Goods Junction08:49 08:38 11 Early Path: 1
Sandbach309:01 08:57 4 Early 3
Alderley Edge109:14 09:15 1 Late Path: 4 2
Wilmslow309:20 09:20 On time Eng: 1 3
Cheadle Hulme109:24½ 09:26 2 Late 1
Adswood Road Junction09:26½ 09:27 1 Late - SL
Stockport Edgeley Junction No 109:28½No report 09:38 09:32 6 EarlyStops or shunts for other trains to pass.
Stockport Edgeley Junction No 209:38½ 09:33 5 Early
Stockport409:39 09:35 4 Early 4
Heaton Norris Junction09:43½ 09:38 5 Early
Ash Bridge Junction09:44½ 09:40 4 Early
Denton Station Junction09:49½ No report Path: 2½
Denton Junction09:53 09:45 8 Early
Guide Bridge109:56 09:52 4 Early 1
Guide Bridge Virtual Quarry Freightliner Heavy Haul10:0009:58 2 Early Train finishes.Terminated

Completed at 18/05/24 17:33:08 by livetrain 4c10p at turnpike. Elapsed time 193 ms.

©2024. Contains Information of Network Rail Infrastructure Limited licensed under the following licence: Click Here.
These pages are provided strictly for non-commercial, non-safety critical purposes; no responsibility is accepted for any inaccurate or out of date information.